Component |
Current
Status |
Recommendations |
Cost |
|
General
Exterior |
The
original date of the Monongalia County Sheriff’s Offices and original jail
construction was over 100 + years ago, (P1,
P2,
P3). The Jail Annex construction was in 1988 (P4,
P5,
P6). The approximate size of the Sheriff’s
Office is 4536 square feet with two stories plus a basement. The approximate size of the jail is 18,900
square feet with 3 stories plus basement.
The foundation of the sheriff’s office is stone. The foundation of the jail annex is
concrete. The foundations are in good
condition. |
We
recommend the jail building be demolished in favor of a new judicial annex. |
|
|
Exterior
Walls |
The general exterior of all buildings are in good
condition. The exterior walls of the
building are brick. There is
efflorescence, (P7,
P8)
on the annex. The paint on the
sheriff’s office brick and wood is peeling, (P9,
P10). Some of the mortar should also be
re-pointed before painting, (P11) |
|
|
|
Roof |
The
sheriff’s office roof is the original metal, (P12). The flashing is rusted. The annex has the original rubber membrane
roof, (P13). This roof is cracking and growing plants
and moss. |
|
|
|
Windows
and Doors |
The
windows in the sheriff’s office are aluminum, double paned, (P14). They were replaced over 30 years ago. They are in good condition. The windows on the jail annex are glass
block in good condition, (P15). The window above the phone system needs to
be replaced. The
doors are steel. They are in good
condition, (P16,
P17). |
|
|
|
ADA
Compliance |
There
is one accessible parking space for the building. The spot is in the street, which is not
preferred, but acceptable. It has the
proper signage, but no painted symbol on the pavement. The ramps do not have handrails on both
sides. There is no accessible bathroom
in the building. The
doors in the sheriff’s office do not have lever handles. |
|
|
|
Fire
Safety |
There
is a fire alarm for the building with smoke and heat detectors, horns and
strobes. The building has exit lights
and battery operated emergency lights.
There is no sprinkler system. There
is no panic hardware on the fire exits.
|
|
|
|
Structure |
The
building wall construction is wood for the older section and concrete block
for the annex. They all appear to be
in good condition. There were no
structural problems noted. |
|
|
|
Security |
The
security system is adequate for the current use of the facility with limited
access doors and locks. There is a
metal detector and CCTV. Security
needs should be considered during the renovation. |
|
|
|
Electrical |
The
service entrance and outdoor transformers are in good condition. The electrical service appears to be
adequate for the current needs.
Upgrades may be needed during renovation for office use. |
|
|
|
Mechanical |
The
building has a Burnham gas fired boiler, which was installed in 1992. It is in good condition. There are several air handlers in fair to
good condition. There is a roof top condenser
unit in good condition. The age of
this equipment is unknown. Some of it
may need to be replaced during the renovation. There
are window air conditions in the sheriff’s office. |
|
|
|
Work
Safety |
There
were no work safety issues identified. |
|
|
|
Space
requirements |
With
the opening of the regional jail, the annex with the exception of a few holding
cells, can be renovated for office and storage space. |
Demolish
the jail to build a new annex |
$1,440,000 |
|
Subtotal
Cost |
|
|
$1,440,000 |
|
Soft
Costs |
Professional
fees, permits, surveys, and studies |
20% |
$288,000 |
|
Total |
|
|
$1,728,000 |