Marshall County Executive
Summary

Front of Courthouse
The
The roof consists of a flat built up roof, a sloped asphalt shingled roof, and a relatively new brown asphalt shingled roof, and there are problems with each type of roof. We recommend repairing the flat roof, replacing the black asphalt shingle roof and repairing the flashing and gutters.
Most of the windows in the building are relatively new, but there are some older ones that in poor condition. We recommend replacing the glass block windows and the main entry windows with historically correct arch top windows.
To bring
this building up to
Some of the electrical wiring in the building is old and in poor condition. We recommend upgrading the electrical service where needed.
The building does have an HVAC unit, but there is still a use of window air conditioning units. We recommend upgrading the HVAC to a central system where the window air conditioning units are being used.
There is a request for more storage space for this county. We recommend building a 15,000 square foot annex.
Total cost for this project: $2,757,600