Component |
Current Status |
Recommendations |
Cost |
|
General Exterior |
The courthouse was constructed in 1939 and is approximately 20,500 square feet, (P1). The building is three stories plus a basement. There is a detached jail on the site that is not in use today. The foundation is constructed from stone.
|
|
|
|
Exterior Walls |
The exterior walls are made of stone. There is no evidence of water damage, but there is mold, especially around the top of the building, (P2). |
Clean the exterior of the building. |
$30,000 |
|
Roof |
The roof is a flat rubber membrane roof. It was replaced sometime prior to 1999. The rubber membrane does not drain well, (P3, P4, P5, P6). |
The roof should be re-sloped to ensure proper drainage and avoid leaks in the future. Footpads should also be added. |
$22,000 |
|
Windows and Doors |
The windows are single pane metal windows that are original to the construction. They are in poor condition, (P7, P8). The doors are wood. They are heavy, but swing freely. They have no threshold or weather stripping. There are also no locks or dead bolts, (P9, P10). They do have panic hardware. |
The windows throughout the building should be replaced with period appropriate windows. The doors should have proper locking hardware installed. |
$48,000 $4,000 |
|
Fire Safety |
There are no fire alarms, sprinklers, exit lights, or battery operated emergency lights. There are not two means of egress from each floor. The stairs are not enclosed by fire rated walls and doors. The exit doors swing freely in the direction of the exit. |
Install a fire alarm system in the building with strobe lights. Install a sprinkler system. Install exit and battery back up lights. Install a second staircase that is enclosed with fire-rated walls and doors. Enclose the stairwell. |
$5,000 $75,000 $5,400 $40,000 $35,000 |
Structure
|
There are cracks in the floor tile, walls and ceilings, (P11, P7, P12). There is also water damage on the ceiling tiles in the circuit court. Replacing the windows and the roof should alleviate the problem. |
Repair the plaster cracks |
$2,000 |
|
Security |
There is no security alarm system or bullet proofing behind the judges bench. The courtroom has a metal detector at the outside entrance, (P13) the judges have a panic buttons, and there are security cameras, (P14). |
Provide a secure entry to the building by moving the metal detector to the accessible entry and providing the following: X-ray machine Ballistic material for the benches Duress alarms for all necessary offices Security system Secure alarmed doors on all other exits |
$35,000 $4,500 $2,000 $5,000 $4,500 |
|
Electrical |
The lighting was florescent. Many of the fixtures are missing covers, (P15). These should be replaced. The electrical system appears to be in good condition and adequate for the building, (P16, P17, P18) |
|
|
|
Mechanical |
The heating system is a series of natural gas fired boilers, (P19). There does not appear to be an air conditioning system for the building; the building uses window units, (P20). |
Install an air conditioning system for the building to improve efficiency and comfort. |
$160,000 |
|
ADA Compliance |
The building is not ADA compliant. The accessible entry is not compliant. There is no elevator to all access to all floors. The bathrooms have been renovated to be complaint, (P21, P22). |
Install an elevator for access to all floors. Provide a new accessible entrance. |
$100,000 $20,600 |
|
Work Safety |
There is evidence of a mold problem on the ceiling above the drop ceiling in the courtroom. This should be investigated, (P23, P24) |
Investigate mold in building. |
$5,000 |
|
Space requirements |
There is a need for additional storage and office space. The circuit clerk and county clerk vaults are filled to capacity. They would like additional office space for the sheriff, city police, development authority, and the chamber of commerce. |
Renovate the jail to provide storage space. Build an annex to provide an additional 10,000 square feet of office, courtroom, and storage space. |
$400,000 $1,450,000 |
|
Sub Total |
|
|
$2,453,000 |
|
Soft Costs |
Professional fees, permits, surveys, and studies |
20% of total |
$490,600 |
|
Total Cost |
|
|
$2,9436,600 |