Planning
Commission Region 9 Engineering Department
And 117-119
WVU Extension (Same Structure as 121)
|
Component |
Current Status |
Recommendations |
Cost |
|
General Exterior |
The brick seemed to be in good shape overall, (P1, P2, P3). 121 W King is part of the same building holding addresses 119, 117, and 115, (115 being a Law Firm\practice office N\A). Addresses 117-119 Apply to the WVU Extension office, (P4), (Same building, left side). 121 Region 9 occupies the right side of the building. The exterior of the building looked to be in far better condition than the interior of section 121 of the building. The Section 117-119 housing WVU Extension offices was in better condition as far as interior, having been recently remodeled. |
Building is in very poor condition and does not serve the needs of the county. It should be totally renovated. See Space Requirements below. |
|
|
Exterior Walls |
The exterior walls of the building are brick. They are in good condition. |
|
|
|
Roof |
The roof is a flat rubber membrane roof with parapet walls. The roof appears to be in poor condition as evidenced by the water damage in the building, (P5, P6, P7). |
Replace roof |
|
|
Windows and Doors |
There are few windows. They are single pane wood frame windows, (P8). The main doors, (P9, P10), are in fair to good condition. |
Repair the doors as needed. |
|
|
Fire Safety |
There is no fire alarm system of any type. There are few exit lights and no emergency lights, (P18). There are only extinguishers and unmarked stairwells, (P11). There is only one means of egress from the second floor of each building. |
Install a second means of egress from the second floor of each building with an interior staircase. Install a fire alarm system in each building with smoke and heat detectors. Enclose the stairwells with fire safe doors and walls. |
|
Structure
|
The building interior is in poor condition. A toilet is rocking\swaying on a rotting floor, probably about to go through the floor, (P12). The interior walls, ceiling and flooring are in poor condition, (P13, P14, P15, P19). |
|
|
|
|
Neither 121 nor
WVU 117-119 were |
Provide Install an elevator or lift system for the second floor Install Install lever handles on doors. |
|
|
Security |
There is no security in the building except locks on the doors. Since there are no courtrooms in the building, locks are probably sufficient. |
|
|
|
Electrical |
The electrical system has old panels, oddly placed; some could not be located by employees. |
Upgrade the electrical service as needed. |
|
|
Mechanical |
The HVAC system appears to be adequate for the building. |
|
|
|
Work Safety |
There is a mold problem in the building, which should be evaluated for toxicity, (P5, P20). There are 9x9 tiles on the floors which indicate there may be asbestos.
|
Perform a mold analysis. Perform an asbestos analysis. |
|
|
Space requirements |
The building is in poor condition and does not meet fire
or |
Renovate 121 West King, upgrade 117-119 as necessary to meet standard required for a county office. |
$1,572,000 |
|
Sub Total |
|
|
$1,572,000 |
|
Soft Costs |
Professional fees, permits, surveys, and studies |
20% of total |
$314,400 |
|
Total Cost |
|
|
$1,886,400 |